sonar

Peterson Builders Launches Another Minecountermeasure Ship, MCM-3

The third of a new class of mine countermeasure ships, the MCM-3 Sentry, was launched and christened recently at Peterson Builders, Inc., Sturgeon Bay, Wise. The Sentry is the second MCM of the Avenger class to be launched at Peterson. Peterson

 

1st Annual OUTSTANDING VESSELS REVIEW

AMBASSADOR In November this year the Jos. L. Meyer shipyard in Papenburg, West Germany, delivered the rollon/ roll-off ship Ambassador to Coordinated Caribbean Transport, Inc. (CCT) of Coral Gables, Fla., a subsidiary of Transway International Corporation.

M A N G H H Reports On Design Requirements For M o d e r n N a v a l Drydocks

Part II: The Critical I m p o r t a n c e O f Block Support A feature article detailing the overall advantages of MAN GHH drydock designs specifically for naval ship applications appeared in the October 1987 issue of Maritime Reporter and Engineering News.

Peterson Builders Launches Their Fourth M C M For U.S. N a vy

Peterson Builders, Inc. (PBI), Sturgeon Bay, Wis., recently christened and launched their fourth Mine Countermeasure Ship (MCM), the USS Devastator, at ceremonies at the yard. The sponsor of the 224-foot USS Devastator (MCM-6) was Mrs. Carol Dixon Ashford.

Electric Boat To Build First Seawolf Submarine Under $726-Million Pact

The Electric Boat Division of General Dynamics Corporation, Groton, Conn., was recently awarded a $725,951,700 fixed-price, incentive contract to build the lead submarine of the U.S. Navy's Seawolf Class (SSN-21). According to reports, the Seawolf Class

MagneTek Defense Systems Offers Quality Power-Conversion Products For Today's Navies

MagneTek Defense Systems, a world leading electrical/electronic power supplier to the military and unit of MagneTek, Inc., manufactures a wide range of products from transducers and uninterruptible power supplies to one of the industry's most

PBI Launches MCM-10, USS Warrior, Seventh in Series Of 11 For Navy; Lays Keel For MCM-12, USS Ardent

The 224-foot wooden mine countermeasure ship MCM-10 was recently launched at the yard of Peterson Builders, Inc., Sturgeon Bay, Wis. The sponsor of the ship, Penelope L. Nyquist, wife of Vice Adm. John W. Nyquist, christened the ship Warrior.

 
 
slipway SNAME software SOLAS solutions sonar spill SS stability standards STCW